Pre-shipment Inspection: Paw Patrol Shower Gel 3-in-1 — Chase, Marshall & Skye 400ml | May 2025 | HOLD & FIXED
Report No. OIS20250517PSI-01. First-round Final Random Inspection (FRI) conducted on 17 May 2025 at a factory in China. Inspector: Lucky.
Subject of inspection: Paw Patrol 3-in-1 shower gel, shampoo and conditioner, 400ml, packaged in three figural bottles under Nickelodeon licence — Chase, Marshall and Skye. Total order: 106,080 pcs (Chase 39,780, Marshall 26,520, Skye 39,780). At the time of inspection, 84,864 pcs — 80% of the order — were finished and packed into PDQ display cartons and outer master cartons (Chase 31,824, Marshall 21,216, Skye 31,824).
Inspection standard: ANSI/ASQ Z1.4-2008 (MIL-STD-105E), plan G-II, normal inspection. Sample: 500 units per criterion. AQL limits: CRI 0 / MAJ 1.5 / MIN 4.0.
Result by criterion: quantity verification — PASS (matched the declared 80% completion). Product and packing check — PENDING (see printing remark below). On-site tests — PENDING (see transportation-test remark below). Workmanship AQL — PASS: CRI found 0 of 0 allowed, MAJ found 2 of 14 allowed, MIN found 20 of 21 allowed.
On-site test results: bottle lid function check — PASS. Barcode scanning test — PASS. 3M tape adhesive test and internal structure check — N/A for this item. Carton dimension and weight check — PASS (measured 33.3×20×44.8cm / 9.11kg). Carton drop test — N/A, the factory declined to run it due to the PDQ display packaging format. Liquid leakage test (2-hour inversion) — PASS. Bottle and liquid volume check — PASS for Chase and Marshall; 2 of 5 Skye samples measured below 400g (387.6g and 387.4g). Bubble effect test — PASS. Scent comparison — PASS.
Open items flagged for correction: during the transportation test, 2 outer cartons were tested and 6 of 32 checked units (18.7%) showed the 3-in-1 character sticker lifting after 2 hours of simulated transport. Separately, of 188 Chase units checked, 32 (17%) showed a visibly poor print on the shrink-film wrap. Both findings are recorded as open items pending correction, which is why the product and packing check and the on-site test criteria are marked Pending rather than Pass.
Defects found in the workmanship sample (500 units): scratching on the bottle surface (10 MIN), air bubbles under the 3-in-1 sticker (2 MIN), colour stains (8 MIN), and underweight liquid fill below 400g (2 MAJ). Total: 0 CRI / 2 MAJ (limit 14) / 20 MIN (limit 21) — numerically within AQL limits, though the minor-defect count sits close to the ceiling.
Overall inspection result: HOLD & FIXED — production was only 80% complete at the time of this first inspection, and the transportation-test sticker adhesion issue and shrink-film printing defect on Chase units were logged as open items. Both were corrected by the factory, and the batch was cleared for shipment once the corrections were confirmed.
Frequently asked questions
Why is this inspection result HOLD & FIXED rather than a straight PASS?
Because at the first inspection only 80% of the order (84,864 of 106,080 pcs) was finished and packed, and the transportation test plus printing check flagged two items: a sticker lifting on 18.7% of checked units and poor printing on 17% of Chase units. The workmanship AQL itself was within limits (0 critical, 2 major, 20 minor). Both flagged items were corrected by the factory, and the batch was only cleared for shipment once the corrections were confirmed.
What does a HOLD & FIXED result mean in an inspection report?
HOLD & FIXED means the first inspection found items requiring correction (such as a packing or minor quality issue), the goods were held pending correction, and — once the factory made the fix — the batch was cleared for shipment. It is a normal part of the QC process, not a rejection (FAIL).
What is an AQL pre-shipment inspection from China?
An AQL (Acceptable Quality Level) inspection is a statistical sample check of goods conducted at the Chinese factory before the goods leave the facility. Oriental IMEX conducts inspections to ANSI/ASQ Z1.4-2008 standard, G-II plan. Report with PASS/HOLD/FAIL decision delivered in 24 hours.